| Bid Classification: |
Construction
|
|---|---|
| Bid Type: | Request for Proposal |
| Bid Number: | RFP-2024-0048 |
| Bid Name: | Flagstone Crescent Sanitary Sewer CIPP Rehabilitation |
| Bid Status: | Awarded |
| Bid Awarded Date: | Mon Jun 3, 2024 (MDT) |
| Published Date: | Tue Apr 9, 2024 3:00 PM (MDT) |
| Bid Closing Date: | Tue Apr 30, 2024 2:00 PM (MDT) |
| Question Deadline: | Fri Apr 19, 2024 2:00 PM (MDT) |
| Duration in months: | 6 |
| Negotiation Type: | Refer to project document |
| Condition for Participation: | Refer to project document |
| Electronic Auctions: | Not Applicable |
| Language for Bid Submissions: | English unless specified in the bid document |
| Submission Type: | Online Submissions Only |
| Submission Address: | Online Submissions Only |
| Public Opening: | No |
| Description: |
This Request for Proposal (the “RFP”) is an invitation by the City of St. Albert (the “City”) to prospective bidders to submit bids for Flagstone Crescent Sanitary Sewer CIPP Rehabilitation, as further described in Section A of the RFP Particulars (Appendix B) (the “Deliverables”). The Work within the Schedules shall include, but is not limited to, the following:
All Work is to be completed in accordance with the November 2021 edition of the City of St. Albert Municipal Engineering Standards and Appendix D. |
| Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. |
| Trade Agreements: |
Show Trade Agreements [+]
Canadian Free Trade Agreement (CFTA)
|
| Categories: |
Show Categories [+]
|
Awarded Summary
That the contract for the provision of supply and installation of CIPP Liner in a sanitary line to be awarded to Insituform Technologies Ltd.(Insituform).
The Work within the Schedules shall include, but is not limited to, the following:
• Operate and Monitor Flow Bypass System (including mobilization and demobilization and isolation (and/or bypass) of local flows)
• Pre-Lining and Post-Lining CCTV
• General Site Cleanup/Restoration (assuming no open cut work)
• Tree Protection
• CIPP Rehabilitation (200mm) - Includes surface cleaning, spot repairs and preparation, minor to moderate root treatment/removal
• Reconnection of Lateral Connection at #1 Flagstone Crescent 20.5m from manhole 2416000
• Cleaning and surface preparation, including spot repair and infiltration control